This mining farm is located in Holeta, Omiroa State, Ethiopia. It has been powered on in Jan 2024 with a total load of 70MW. Ethiopian 500MW mine supply electricity to the mining farm with a total capacity of 6000MW.
Ethiopian 500MW mine. Landmark building: Holeta. 500KV substation with a total capacity of 6000MW. Electricity: Clean Energy Renaissance Dam, the largest hydropower station in Africa, with a total installed capacity of 6000MW. With an average altitude of nearly 3,000 meters, Ethiopia is known as the "Roof of Africa". Ethiopia has many rivers and lakes and rich water resources. Known as the "Water Tower of East Africa", the average temperature throughout the year is 10-20 degrees. Electricity consumption: The mine contracts directly with the Ethiopian National Grid. The first phase of 70MW has been put into operation safely.
(0 reviews)
No reviews.
Disclaimer
The information provided on this page regarding data centers is intended solely for informational purposes. It does not constitute investment advice, endorsement, or a recommendation. The data centers listed are not affiliates of Bitdeer and the information shared here is not verified and should not be relied upon as a basis for making any investment decisions. Readers are encouraged to conduct their own due diligence and verify the accuracy and relevance of any information provided. We do not endorse, guarantee, or assume any responsibility for the data centers mentioned, and we disclaim all liability for any decisions or transactions made based on the information presented. By using this website, you acknowledge and agree that Bitdeer is not liable for any consequences or damages arising from your reliance on or use of the data center information provided.
Customer Reviews
(0 reviews)
No reviews.